Burning zone/Thermal loading TL | ||||
Please Enter / Step-to Input Values | ||||
Burning Zone Area m2 | Fuel Rate kg/hr | |||
CALCULATED TL Gcal/hr/m2 | Net Cl.Value kcal/kg. | |||
2.5-----NORMAL RANGE-------4.8 | ||||
Volumetric loading VL | ||||
Please Enter / Step-to Input Values | ||||
Clinker Production tpd | Burning Zone Cross Sectional Area, m2 | |||
Kiln Length m | ||||
CALCULATED VALUE OF VL tpd/m3 | ||||
3.5-----NORMAL RANGE-------5.5 | ||||
Material residence time in kiln RTK | ||||
Please Enter / Step-to Input Values | ||||
Kiln Length (L), m | Kiln Slope(s), % | |||
Eff. Kiln Dia. (Deff), m | Kiln Speed (n), rpm | |||
CALCULATED VALUE OF RTK min | ||||
20-----NORMAL RANGE-------30 | ||||
BACK TO PYRO CALCULATIONS |